Case Study Corporate Office

Corporate HQ Restroom Modernization: NovaTech Offices, Boston

Challenge:
NovaTech’s 5-floor headquarters faced complaints about inconsistent water temperature, worn finishes, and outdated fixtures. Sustainability targets required a 25% water reduction.

Solution:
ArchFaucet specified sensor-activated faucets and soap dispensers with matching finishes, powered by hybrid battery/AC systems for continuous uptime. Custom brushed nickel finishes aligned with the company’s interior design palette.

Results:

  • 38% reduction in overall water consumption.
  • Enhanced user satisfaction (92% positive feedback in post-renovation survey).
  • Consistent temperature and activation accuracy across 70+ fixtures.
  • Maintenance team reports 60% fewer service calls.

Lessons Learned:
Consistency across floors (same sensor models, same calibration) simplified maintenance and user adaptation.

CATEGORIES:

Uncategorized

No responses yet

Leave a Reply

Your email address will not be published. Required fields are marked *